TM 5-5420-226-20-3
SHIFT LINKAGE ADJUSTMENT (Sheet 22 of 28)
114.
Using vise and 9/16 inch wrench, loosen
jamnut (BS).
115.
Using 9/16 inch wrench, turn rod bearing
end (BN) clockwise until rod (BP) is past
hole (BR).
116.
Using vise, torque wrench, and 9/16 inch crowfoot adapter, tighten jamnut (BS) tO 16-18
lb-ft (22-24 Nm).
117.
Using 9/16 inch wrench, turn rod bearing end (BM) clockwise or counterclockwise until
distance between centers of rod bearing ends (BM) and (BN) measures 5-3/4 tithes.
118.
Using vise, torque wrench, and 9/1 6 inch
crowfoot adapter, tighten jamnut (BL) to
16-18 lb-ft (22-24 Nm) while maintaining
5-3/4 inch measurement.
119.
Manually install stud and rod end bearing
assembly (BK).
120.
Using 9/16 inch wrench, install two
screws (BJ).
TA169075
Go on to Sheet 23
11-74