• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
TRACK ASSEMBLY REPLACEMENT - Continued
TRACK ADJUSTING LINK REPLACEMENT - Continued

M48A5 Tank Chassis, Transporting: For Bridge, Armored-Vehicle-Launched; Scissoring Type, Class 60 -3 Page Navigation
  818    819    820    821    822  823  824    825    826    827    828  
img
. . . . .
TM 5-5420-226-20-3
TRACK ADJUSTING LINK REPLACEMENT (Sheet 1 of 5)
PROCEDURE INDEX
PAGE
PROCEDURE
14-75
Removal
14-78
Installation
Slip joint pliers
TOOLS:
Ratchet with 3/4 in. drive
3/4 in. socket with 3/4 in. drive
1-1/8 in. socket with 3/4 in. drive
Pry bar
Wire brush
Hammer
Slide hammer puller
SPECIAL TOOLS: Roadwheel adapter (Item 8, Chapter 3, Section I)
Rags (Item 65, Appendix D)
SUPPLIES:
Cotter pins (2 required)
Lockwashers (2 required)
Three
PERSONNEL:
PRELIMINARY PROCEDURES:
Remove compensating idler wheels (page 14-50).
Remove front fender (page 16-45).
NOTE
This adjusting link replacement procedure is for left side
of vehicle. Right side adjusting link procedure is similar.
Go on to Sheet 2
Change 3 14-75


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.