TM 5-5420-226-20-3
EXHAUST DOORS REPLACEMENT (Sheet 1 of 4)
PROCEDURE INDEX
PROCEDURE
PAGE
Removal
Installation
TOOLS:
1-1/8 in. socket with 1/2 in. drive
9/16 in. socket with 1/2 in. drive
5 in. extension with 1/2 in. drive
Ball peen hammer
Needle nose pliers
Pinch bar
Drift punch
Suitable hoist
SPECIAL TOOLS: Sling (Item 31, Chapter 3,
Section 1)
SUPPLIES: Cotter pin (4 required)
REFERENCE:
PERSONNEL:
Three
PRELIMINARY PROCEDURE:
REMOVAL:
1.
Using 1-1/8 inch socket, remove four screw
assemblies (A).
2.
Using pliers, remove two cotter pins (B) securing headed pins (C) in door hinges. Throw
cotter pins (B) away.
Go on to Sheet 2
TA169429