TM 5-5420-278-10
0013 00
0013 00-4
END OF WORK PACKAGE
LEAKS (Contd)
Class I
Seepage of fluid (as indicated by wetness or discoloration) not
great enough to form drops.
Class II
Leakage of fluid great enough to form drops but not enough to
cause drops to drip from item being checked/inspected.
Class III
Leakage of fluid great enough to form drops that fall from the
item being checked/inspected.
PAINTING
Paint touch-up of the IRB should be performed as needed during PMCS. Notify
unit maintenance.