Table 1. Operator Preventive Maintenance Checks and Services (PMCS) for Improved Ribbon Bridge Ramp Bay (Contd).ITEM TONOT FULLYITEMCHECK/MISSIONNO.INTERVALSERVICEPROCEDURECAPABLE IF:TM 5-5420-278-100015 000015 00-2852AfterFoldlocks, travellatch, andreceptaclesCheck for structural damage andoperation.Damage preventslocks or latches from securing bay.CAUTIONCheck to ensure front andrear swivel hooks are fullyretracted before retrievingbay, or damage to equipmentwill result.NOTEIf more than 4 gallons ofwater is drained from anyponton with bay in water lessthan 8 hours, notify unitmaintenance.53AfterDrain plugsa. Remove and drain accumulatedwater from pontons.b. Ensure drain plugs are secured andnot cracked or broken.b. Any drain plug ismissing, cracked, orbroken. Any visiblehole will deadline abay. 54AfterRamp bay55AfterLower lock-drive jack screwCheck for structural damage.Lubricate threads.Damage preventsbay from being usedfor next mission.END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business