Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-27
49
During
Right belay
cleat (5)
Check for damage or if missing.
5
51
After
Fluid system
components
Check for fluid leaks.
Any Class III fluid
leak is noted.
CAUTION
Ensure all gravel, rocks,
mud, and other debris are
removed from openings at
unfolding stabilizer mounting
brackets prior to folding bay.
Failure to comply may result
in jamming during folding
operations.
NOTE
Perform After operation
PMCS prior to recovering
bay.
The time requirement to
complete After operation
PMCS is 10 minutes per
ramp bay.
Refer to WP 0053 00 for
power wash pump operating
instructions.
50
After
Walkways and
roadways
a. Check to ensure that all dirt, mud,
snow, ice, and debris are removed.
b. Check for structural damage
incurred during operation.
b. Damage prevents
recovery.