47
During
Left and right
rear swivel
hooks (1) and
indicators (2)
a. Check hook for structural damage.
b. Check that indicator is present.
a. Damage prevents
proper hook
operation.
Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-26
2
1
2
48
During
Right
roadway (3) and
walkway (4)
surfaces
Check for structural damage,
deformity, holes, and tears.
Damage prevents
safe traffic crossing
or causes personnel
safety hazard.
3
4
~
~