Table 1. Operator Preventive Maintenance Checks and Services (PMCS)
for Improved Ribbon Bridge Ramp Bay (Contd).
ITEM TO
NOT FULLY
ITEM
CHECK/
MISSION
NO.
INTERVAL
SERVICE
PROCEDURE
CAPABLE IF:
TM 5-5420-278-10
0015 00
0015 00-23
42
During
Left front
longitudinal
upper
coupling (4) and
receptacle
blocks (5)
Check for proper operation and
structural damage.
Damage prevents
coupling from
proper operation
or seating in
receptacle.
4
5