Google+
Facebook
LinkedIn
Twitter
Digg
StumbleUpon
Home
Download PDF
Order CD-ROM
Order in Print
DRAINING AND FILLING PUMP SYSTEM (Contd) - TM-5-5420-278-24P_199
REMOVAL - TM-5-5420-278-24P_202
TM-5-5420-278-24P Common Bridge Transporter (CBT) M1977 and Bridge Adapter Pallet (BAP) M15 Manual
Page Navigation
142
143
144
145
146
147
148
149
150
151
152
TM 5-5420-278-24&P
0033 00
0033 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN
5420-01-470-5825
P/N 12478918;
INTERIOR BAY M17
NSN
5420-01-470-5824
P/N 12478919.
PUMP ACCESS COVER REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
General mechanic’s tool kit
(Item 3, WP 0135 00)
Materials/Parts
Three
lockwashers
(WP 0102 00)
Grease (Item 10, WP 0134 00)
Equipment Condition
Ramp bay removed from transporter and unfolded
(TM 5-5420-278-10).
Chem-lite holder removed (TM 5-5420-278-10).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business