TM 5-5420-278-24&P
0056 00
0056 00-1
UNIT MAINTENANCE INSTRUCTIONS
IMPROVED RIBBON BRIDGE (IRB)
RAMP BAY M16
NSN 5420-01-470-5825 P/N 12478918;
INTERIOR BAY M17
NSN 5420-01-470-5824 P/N 12478919.
TRAVEL LATCH AND RECEPTACLE MAINTENANCE
TRAVEL LATCH REMOVAL, RECEPTACLE REMOVAL,
RECEPTACLE INSTALLATION, TRAVEL LATCH INSTALLATION, ADJUSTMENT
INITIAL SETUP:
Tools and Special Tools
General mechanics tool kit
(Item 3, WP 0135 00)
Common No.1 tool kit (Item 1, WP 0135 00)
Materials/Parts
Eight lockwashers (WP 0098 00 IRB-R,
or WP 0122 00 IRB-I)
Two cotter pins (WP 00098 IRB-R,
or WP 0122 00 IRB-I)
Equipment Condition
Bay removed from transporter
(TM 5-5420-278-10).