TM 5-5420-278-24&P0018 000018 00-3Figure 1. PMCS for Ramp Bay.PREVENTIVE MAINTENANCE CHECKS AND SERVICES (Contd)UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR RAMP BAYThis PMCS uses the one-look format. With bay on the transporter, start at the front (connecting end) ofbay ponton, proceeding counterclockwise. Refer to figure 1.During PMCS, ensure that components and assemblies are correctly installed. Incorrect installation maycause equipment damage or failure.When checking or inspecting an item, ensure that all attaching/mounting hardware is properly secured.Loose, cracked, broken, or missing hardware may cause equipment failure or injury to personnel.Remove rust and accumulated corrosion during PMCS. Corrosion not removed promptly will degradeequipment performance.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business