TM-5-5420-279-10
2.1.22.4
Steel wire ropes from the drum winches, on the launch frame, are routed around the
launch beam to the home and far bank carriages see Figure 2. 13. The upper winch
cable being routed along the top of the launch beam around the end of the forward
launch beam and connecting to the front of the far bank carriage. The lower winch
and connecting to the rear of the far bank carriage.
Figure 2. 14 Home Bank and Far Bank Carriages
2-16