TM-5-5420-279-10
Crane Loading
CAUTION
The values given on the load diagram are definitive and must not be exceeded. They apply
when the crane is operated with the boom horizontal, with the jib horizontal, and with the
stabilizers and slides extended on both sides. When the crane is on an incline, the
maximum load is reduced.
4.3.7.1
Refer to the crane load diagram for definitive extended loading.
Figure 2. 1 Crane Load Diagram