TM-5-5420-279-10
Tail lift Hand Control
4.9.4.35
Release the LIFT UP switch when the tail lift platform positions the pinning operatives
at their convenient height.
WARNING
CRUSH HAZARD. DEATH OR SEVERE INJURY COULD RESULT IF PERSONNEL STAND
BETWEEN THE SUSPENDED LOAD AND THE MODULE LOCATED ON THE LAUNCH
FRAME.
4.9.4.36
Remove the R clips and bridge pins from the rear jaws of the parallel module and the
front jaws of the home bank ramp module and place them on the tail lift platform.
4.9.4.37
Align the dowels of the parallel module and the home bank ramp module.
NOTE
If due to the angle of the ramp module, the lower jaws connect first. Align the jaws and
the jaw alignment system. Jib forward with the crane so that the module rotates around
the jaws until the dowels are aligned. For further information refer to Chapter 3
Connecting Modules Where the Jaws Contact First.
4.9.4.38
Insert the shootbolts to connect the home bank ramp module and the parallel module,
ensuring that they are locked.
4-77