TM-5-5420-279-10
Table 8.3 Operators PMCS (During) (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
88
During
Launcher
Listen for unusual noises, look for
Launcher makes
erratic movement, monitor hydraulic
unusual noises,
system, and visually check for
movement is erratic,
hydraulic fluid leaks.
hydraulic pressure
fluctuates over wide
range or class III
hydraulic leak
evident.
3
1
2
89
During
Winch
Check winch cable (1) pays out
Winch operation
cable
smoothly during winch operation.
erratic.
90
During
Energy
Check that energy chains (3) stay
Energy chains
chains
connected, and electrical cable
disconnect from each
looms and hydraulic pipes run
other.
smoothly within the energy chains.
91
During
Energy
Check that energy chain under
chains
launcher (2) does not contact the tail-
lift, when spreading and closing the
slide frame.
92
During
Far bank
Far bank support
support
operates correctly.
ineffective.
8-35