TM-5-5420-279-10
Table 8.4 Operators PMCS Parallel or Ramp Unit (During) (continued)
Not Fully Mission
Item
Interval
Location
Procedure
Capable If:
No.
1
3
2
101
During
Parallel or
Ensure lifting sling (1) secured
ramp unit,
under deck and out of way of traffic.
lifting sling
102
During
Parallel or
Check curb (2) secured in upright
ramp unit, curb
position.
103
During
Parallel or
Check bridge edge marker in
ramp unit,
upright position.
bridge edge
104
During
Parallel or
Ensure no serious damage or
Excessive damage
ramp unit,
distortion to top surface of bridge
evident.
decks
beyond normal wear and tear.
105
During
Parallel or
Ensure no serious damage or
Excessive damage
ramp unit, side
distortion to bridge side panels
evident.
panels
beyond normal wear and tear.
106
During
Parallel or
Ensure no serious damage or
Excessive damage
ramp unit,
distortion to bridge bottom chords
evident.
bottom chords
beyond normal wear and tear.
107
During
Parallel or
Ensure no serious damage to
Damage evident,
ramp unit,
dampers, look for signs of leaking
Class II leak evident.
dampers
or abnormal operation and secure
Loose attachment.
damper attachments (3).
108
During
Ramp units
Ensure correct ground bearing and
Not correctly
grounding and
anchorage.
grounded and
anchorage
anchored.
8-38 Change 1