TM-5-5420-279-10
Table 8.3 Operators PMCS (After)
Location
Item
Not Fully Mission
Item to
Interval
Procedure
No.
Capable If:
Check
Service
3
2
1
109
After
Cross
(a) Check cross connection assembly
Damage or class III
connection
for damage and hydraulic fluid leaks.
leak evident.
assembly
(b) Check that inlet manifold
stopcock handle (1) is in the off
position.
110
After
Crane
(a) Visually, examine the crane (2)
Damage evident.
for damage.
(b) Visually, examine crane
Class III leak evident.
111
After
Crane
Check crane-operating controls (3)
Damage or class III
operating
for damage and hydraulic fluid leaks.
leak evident.
controls