TM-5-5420-279-10
Table 8.5 Operators PMCS (After) - (continued)
Location
Not Fully Mission
Item
Item to
Procedure
Interval
Capable If:
No.
Check
Service
3
2
1
4
162
After
R/H
(a) Check R/H A-frame upper sliding
Damage evident.
stabilizer
section (1) for damage.
leg sliding
(b) Check sliding frame pin (2) fitted
Frame
correctly.
163
After
R/H
Check R/H stabilizer leg energy chain
stabilizer
(4) cables and hydraulic pipes for:
leg energy
(a) Damage.
Damage evident.
chain
(b) Hydraulic fluid leaks.
Class III leak evident.
(c) Ensure that cables and hydraulic
Crossed cables or
pipes are laying correctly (no crossed
pipes.
pipes or cables).
164
After
R/H
Check R/H stabilizer leg energy chain
stabilizer
(4) links for:
leg energy
(a) Damage.
Damage evident.
chain
(b) Separated links.
Separated links
evident.
165
After
R/H
Check the R/H A-frame raise cylinder
A-frame
(3) for:
raise
(a) Damage.
Damage evident.
cylinder
(b) Hydraulic fluid leaks.
Class III leak evident.
8-53