TM 5-5420-280-10
0007 00
PALLET CONTROLS AND INDICATORS (Contd)
AP
SHORING PAD MOUNTING SCREWS -- There are four mounting screws
located on each shoring pad. Shoring pads support pallet when loaded on
C-130 aircraft and must be removed prior to transloading pallet to PLST. To
remove, loosen four screws with 3/4 in. (19 mm) BII wrench, and slide shoring
pad off mounting brackets. When installing, yellow paint marks for left and
right pads must line up with yellow paint marks on pallet frame.
AP
AP
MOUNTING BRACKET
YELLOW PAINT MARKS
SHORING PAD
AQ
TRANSLOAD ROLLER MOUNTING PINS -- There is a left and right-hand
transload roller installed on its respective fixed axle bracket prior to transloading
pallet to PLS trailer. To install, position transload roller on fixed axle bracket with
tapered end of bushing facing to the rear of pallet, and install straight pin and
lynch pin on inboard mounting hole only. Transload rollers are normally removed
from fixed axle brackets only when unloading pallet to ground. Stow rollers and
mounting hardware in pallet toolboxes when pallet is on ground.
FIXED AXLE BRACKET
LYNCH PIN
RIGHT
LEFT
AQ
TO THE REAR
BUSHING TAPER
(PLS-TRAILER)
FACING REAR
TRANSLOAD ROLLER
0007 00-18