TM 5-5420-280-10
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
UNLOADING PALLET TO GROUND
CAUTION
Assistant will act as ground guide when maneuvering
the Common Bridge Transporter (CBT) and during
operation of the LHS. Failure to comply may result in
damage to equipment.
NOTE
During all transporter operations, the CBT operator will
drive and be responsible for the operation of the Load
Handling System (LHS) by means of the cab and remote
control boxes. The assistant will act as a ground guide,
be responsible for directing the operator by using hand
signals, and assist the operator as needed.
1. Position CBT so that rear of vehicle is approximately 16 ft (4.9 m) in front of
where pallet is to set on ground. Apply service brake (3), move transmission
selector lever (2) to N (neutral), and pull PARKING BRAKE control (1) out.
1
3
2
CAUTION
If bridge halves are on pallet, do not attempt to unload
pallet to ground without the fastening rods installed.
Failure to comply may result in damage to equipment.
NOTE
Perform step 2 if bridge is on pallet and fastening rods
are not installed.
2. Install two fastening rods on each side of bridge (4) or, if fastening rods are
installed, ensure they are properly tightened. Refer to WP 0008 00.
4
FASTENING
RODS