TM 5-5420-280-10
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
OPERATION OF LPU FOR BRIDGE LAUNCH OR RETRIEVAL
CAUTION
Prior to disconnecting/connecting hydraulic supply hoses,
clean debris from couplings and catch residual oil with clean
rags. Failure to comply may result in damage to equipment.
NOTE
Perform steps 1 through 3 if pallet hydraulic supply hoses are
connected to CBT.
1. Disconnect pallet hydraulic supply hoses (7) and (10) from CBT hydraulic
pump hoses (8) and (9), located adjacent to LHS cabinet assembly (2) on late
model CBTs, or at rear of work platform (13) on early model CBTs.
2. Connect CBT hydraulic pump hoses (8) and (9) to LHS hydraulic supply quick-
disconnect couplings (6) and (11), located on bracket (1) on late model CBTs, or
bracket (12) on early model CBTs.
2
4
3
6
7
12
5
8
1
9
11
6
10
7
9
13
11
8
10
CBT COUPLINGS,
CBT COUPLINGS,
EARLY MODEL CBT
LATE MODEL CBT