TM 5-5420-280-10
0032 00
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF PALLET FROM CBT
(Contd)
14. Route safety chain (10) through launch boom eye (11) and connect ends
together with snap hook (12).
NOTE
Assistant will hold pallet lifting brackets until secure.
15. Position two pallet lifting brackets on cross-force couplings (8) of upper bridge
half (9) and against outer edges of launch boom (5), and adjust length of two
launch boom locks (7) by turning turnbuckles until lifting brackets are tight.
5
8
LIFTING
LARGE
HOOK
RING
LIFTING
SLING
APPROX.
PALLET LIFTING
13FT
BRACKETS
(4M)
4
5
10
11
~
12
6
FASTENING
RODS
7
9
8
16. Remove locking pin (15) from hook arm (13) and frame (14).
4
13
13
15
14
0032 00-5