MANUALLY REMOVING LOAD DURING LHS HYDRAULIC
POWER LOSS (Contd)
CAUTION
Ensure slave hoses are not stretched or run over during
operation or damage to equipment may result.
4. Connect two slave hose assemblies (5) to LHS quick-disconnects (1) and (4)
on disabled transporter with inoperable hydraulics.
5. Connect opposite ends of two slave hose assemblies (5) to CBT hydraulic
pump hoses (2) and (3) on transporter with operable hydraulics.
5
2
3
6. Start engines of both transporters and perform load/unload operations using
loading/unloading procedures.
7. After completion of loading/unloading procedures, disconnect and connect
hoses in reverse order.
END OF WORK PACKAGE