TM 5-5420-280-10
OPERATOR INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
PREPARATION FOR EMERGENCY MANUAL REMOVAL OF PALLET FROM CBT
WARNING
Performing this procedure will require the assistance of
field maintenance personnel and use of a crane or other
lifting device having a lifting capacity of 21,000 lb (9,526
kg). Failure to comply may result in damage to
equipment or possible injury or death to personnel.
CAUTION
Main frame of Load Handling System (LHS) must be in
its fully stowed position. Attempting to lift pallet with
main frame not stowed could result in damage to
equipment.
NOTE
This procedure is performed when the pallet cannot be
unloaded to the ground due to mechanical failure of the
CBT's LHS.
1. Apply service brake (3), move transmission selector lever (2) to N (neutral),
and pull PARKING BRAKE control (1) out. Chock front wheels.
1
3
2
2. Ensure LHS main frame (1) is fully stowed (down). If LHS main frame (1) is
not fully stowed, lower LHS main frame by following solenoid manual bypass
procedure. Refer to WP 0031 00, Manually Bypassing Solenoid During Electric
Power Loss.