TM 5-5420-280-10
0042 00
Preventive Maintenance Checks and Services (PMCS)
for Common Bridge Transporter (Contd).
NOT FULLY
ITEM
ITEM TO
INTERVAL
PROCEDURE
MISSION
NO.
CHECK/SERVICE
CAPABLE IF:
NOTE
Perform HEMTT PMCS prior to
performing PMCS for Common
Bridge Transporter (CBT) Load
Handling System (LHS) Refer to
TM 9-2320-279-10.
If leakage is detected, further
investigation is needed to
determine the location and
cause of the leak. If there is any
doubt, contact your supervisor
or field maintenance.
1
Before
Leaks on
Check underneath vehicle for evidence
Any Class III leak is
ground or CBT
of obvious fluid leakage.
evident.
components
2
Before
LHS hydraulic
Check oil level at reservoir site gauge.
Oil level is not
reservoir (1)
visible in site gauge.
1
~
0042 00-2