TM 5-5420-280-10
MAINTENANCE INSTRUCTIONS/PMCS
RAPIDLY EMPLACED BRIDGE (REB)
PREVENTIVE MAINTENANCE CHECKS AND SERVICES FOR COMMON
BRIDGE TRANSPORTER (CBT) LOAD HANDLING SYSTEM (LHS)
This PMCS uses the one-look format. Beginning at the driver's side of cab,
proceed to the right in a counterclockwise direction. Refer to PMCS for CBT LHS
Figure below.
During PMCS, ensure components and assemblies are correctly installed.
Incorrect installation may cause additional equipment damage or failure.
When checking/servicing an item, ensure that all attaching/mounting hardware
is properly secured. Loose, cracked, broken, or missing hardware may cause
equipment failure or injury to personnel.
LUBRICATION
Perform lubrication checks and services after completing PMCS. Refer to
PMCS for CBT LHS Figure.