TM 5-5420-280-10
MAINTENANCE INSTRUCTIONS/PMCS
RAPIDLY EMPLACED BRIDGE (REB)
PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)
GENERAL
is for the Bridge. The PMCS list checks required to keep the equipment in good
operating condition. PMCS is performed to ensure the equipment is ready for
operation at all times.
NOTE
Before operation is performed prior to launch. During
operation is performed during a mission launch. After
operation is performed after retrieval and upon
returning from mission.
a. Before operation, perform PMCS intervals listed "Before." Observe all
cautions and warnings.
b. During operation, perform PMCS intervals listed "During." Observe all
cautions and warnings.
c. After operation, perform PMCS intervals listed "After." Observe all cautions
and warnings.
NOTE
If bridge is not mission deployed (launched) within 30
days perform Before, During, and After PMCS.
d. At any PMCS interval, if your equipment fails to operate, notify field
maintenance.
PURPOSE OF PMCS TABLE
The purpose of the PMCS is to provide a systematic method of inspection and
required service of equipment. In this way, small defects can be detected early before
they become a major problem, causing the equipment to fail to complete its mission.
The PMCS is arranged with the individual PMCS procedures listed in sequence
under assigned intervals. The most logical time (before, during, and after operation)
to perform each procedure determines the interval to which it is assigned. Make a
habit of performing the checks in the same order each time. See Explanation of
Columns for a description of the columns in PMCS.