TM 5-5420-280-23&P
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
BRIDGE RETAINING WIRE ROPE ASSEMBLIES REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge unloaded to ground.
Refer to TM 5-5420-280-10.
Materials/Parts