TM 5-5420-280-23&P
BRIDGE MAINTENANCE INSTRUCTIONS
RAPIDLY EMPLACED BRIDGE (REB)
BRIDGE QUARTER REPLACEMENT
REMOVAL, INSTALLATION
INITIAL SETUP:
Tools and Special Tools
Equipment Condition
Forward Repair System (FRS)
Bridge half removed from bridge pallet and
Personnel Required
Chains or cables
Four 62B
Materials/Parts
One 62F