WINCH MOUNTING BRACKET PULLEYS REPLACEMENT
WINCH STOWAGE DRUM, MOUNTING BRACKET, AND AXLE UNIT REPLACEMENT

Special Tools List For Rapidly Emplaced Bridge (Reb) Page Navigation
  360    361    362    363    364  365  366    367    368    369    370  
img
TM 5-5420-280-23&P
0060 00
WINCH MOUNTING BRACKET PULLEYS REPLACEMENT (Contd)
REMOVAL
NOTE
Both pulleys are removed and installed the same way. Lower pulley
is shown and must be removed first.
1. Remove two snaprings (5) from pin (4).
2. Support pulley (3) and push pin (4) out of winch mounting bracket (1) and pulley (3).
3. Lower pulley (3) and remove from winch mounting bracket (1) and winch wire rope (2).
4. Repeat steps 1 through 3 to remove upper pulley (3).
INSTALLATION
1. If upper pulley (3) was removed, install upper pulley (3) on winch mounting bracket (1) with winch
wire rope (2) in top groove of pulley (3).
NOTE
Apply a light coat of grease to pins at installation.
2. Support pulley (3) and push pin (4) through winch mounting bracket (1) and pulley (3).
3. Install two snaprings (5) on pin (4).
4. Install bottom pulley (3) on winch mounting bracket (1) with pin (4) and two snaprings (5).
5. Connect winch wire rope to launch beam lifting eye and swivel block. Refer to TM 5-5420-280-10.
1
2
5
3
1
4
5
3
END OF WORK PACKAGE
0060 00-2