TM 55-1945-205-10-20040 00 10040 00OPERATOR MAINTENANCEROLL-ON/ROLL-OFF DISCHARGE FACILITYPERSONNEL SHELTER OPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item XX, WP XXXX 00)Life Preserver, Vest (Item XX, WP XXXX 00)Gloves, Men’s and Women’s (Leather Palm) (Item XX, WP XXXX 00)Goggles, Sun, Wind and Dust (Safety) Item XX, WP XXXX 00)Helmet, Safety (Brown) (Item XX, WP XXXX 00)Personnel RequiredSeaman 88KPREPARATION FOR MOVEMENT - REMOVAL OF PERSONNEL SHELTER REMOVE PERSONNEL SHELTER:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during RRDF operations and maintenance. Failure to observe these precautions could result in serious injury or death.1.Detach personnel shelter power cable from generator container power receptacle. (WP 0041 00)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business