TM 55-1945-205-10-40023 00 10023 00OPERATOR MAINTENANCEFLOATING CAUSEWAYLIGHT TOWERSOPERATION UNDER USUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Personnel RequiredSeaman 88KPREPARATION FOR USE - INSTALLATION OF LIGHT TOWER UNITREMOVE FORWARD AND AFT LIGHT TOWER UNIT FROM CONTAINER:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.127(The following procedure is typical for the forward and aft light tower units installed in the ISO container, except the light tower must be installed on the aft light tower unit.1.Release tiedowns and remove light tower trailer drawbar (1) and drawbar jack (2) from ISO container.:,1*2.Using forklift pull light tower trailer and pallet from container.3.Install trailer drawbar (1) and drawbar jack (2) on light tower trailer with bolt (3) and nut (4) and set up on drawbar jack (2).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business