TM 55-1945-205-10-40023 00 40023 00INSTALL LIGHT TOWER ON AFT LIGHT TOWER UNIT 127(Light tower is already attached on forward light tower unit.1.Disconnect drawbar eye (11) from fork lift truck towing pintle.2.Extend both outriggers (21) and install locking pins (22) fully.3.Level unit using jacks (23) and bubble level indicator (24) on drawbar (calm water) or measure from deck at four corners of unit. 4.Secure light tower trailer to FC platform with tiedowns.:,1*5.Remove hitch pins from upper light tower stowage on container side and remove tower from container.2122222423212323
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business