9.
Unlatch and open container end doors.
10. Secure doors to container with locking bars.
11. Remove aluminum wedge (6) from the toolbox.
12. Install wedge (6) in anchor (5) to keep anchor flukes from moving while being lifted.
:,1*
13. Using forklift and forklift lifting adaptor, remove anchor (5) through end doors.
:,1*
127(
It is recommended that anchors be placed as close as possible to the edge of the deck to
prevent unnecessary dragging of the anchors during deployment.
14. Place anchor (5) in close proximity to selected mooring leg assembly point.
15. Remove wedge (6) from anchor.
16. Use wedge on second anchor, remove and return wedge to toolbox.
6