TM 55-1945-205-10-4
0033 00 8
0033 00
f.
Attach buoy cable (12) to shackle (14) on bottom of anchor (15) tandem link.
g.
Attach one end of eye to eye swivel (16) to anchor shackle (17) and opposite end of swivel to shackle (18).
h.
Attach 30 ft cable (19) between shackle (18) and shackle (20) on bottom of anchor (21) tandem link.
i.
Attach eye to eye swivel (22) to anchor shackle (23).
j.
Attach two 150 ft cables (24), with swivel, to eye to eye swivel (22) using shackle (25).
k.
Remove vertical padeye (26) from toolbox.
l.
Attach opposite end of 150 ft cable (24) to vertical padeye (26) with shackle (27).
:,1*
m. Using forklift, return emptied upper cable tray to upper shelf of container.
2.
Remove container locking bars.
3.
Close and latch container end doors.
:,1*
4.
Remove container from FC.
5.
Install vertical padeye (26) to FC module.