TM 55-1945-205-10-4
0033 00 1
0033 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
OFFSHORE ANCHOR MOORING LEGS
OPERATION UNDER USUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Forklift Adaptor (Item 19, WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Floating Causeway Assembled. (WP 0015 00)
OPERATING PROCEDURES - DEPLOY OFFSHORE ANCHOR MOORING LEGS
UNPACK OFFSHORE CONTAINER
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
127(
The following procedure is typical for the assembly and deployment of offshore anchor
mooring legs. Two anchors, a buoy and one set of cables with accessories make up
one mooring leg.
1.
Position offshore containers parallel with and on alternate FC intermediate sections for assembly of mooring legs
prior to deployment.