TM 55-1945-205-10-40033 00 10033 00OPERATOR MAINTENANCEFLOATING CAUSEWAYOFFSHORE ANCHOR MOORING LEGSOPERATION UNDER USUAL CONDITIONS INITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Crowbar (Item 14, WP 0104 00)Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)Forklift Adaptor (Item 19, WP 0104 00)Personnel RequiredSeaman 88KEquipment ConditionFloating Causeway Assembled. (WP 0015 00)OPERATING PROCEDURES - DEPLOY OFFSHORE ANCHOR MOORING LEGSUNPACK OFFSHORE CONTAINER:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.127(The following procedure is typical for the assembly and deployment of offshore anchor mooring legs. Two anchors, a buoy and one set of cables with accessories make up one mooring leg.1.Position offshore containers parallel with and on alternate FC intermediate sections for assembly of mooring legs prior to deployment.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business