Drive female guillotine bar (28) down, using sledgehammer, to secure padeye (22) in place.
DEPLOY MOORING LEGS
1.
Deploy mooring leg.
a.
Assure radio communications are established between WT operator and soldier in charge of mooring leg
assembly and deployment on FC.
b.
Attach shackle (retrieval pendant) (11) to WT forward winch cable.
c.
Throw buoy (7) in water.
d.
Pull mooring leg assembly completely off deck by backing down warping tug perpendicular to the
long axis of FC.
&,21
Do not overstress the mooring cable with the WT to prevent pulling the padeye out
of the guillotine. Failure to comply will cause damage to the guillotine and loss of the
mooring leg assembly.
e.
When mooring cable (19) and (23) is completely off deck and slack has been removed, cut backing power on
WT as not to overload mooring wire.
f.
Allow weight of anchors (15) and (21) to pull WT back toward FC until anchors land on bottom.
g.
When buoy cable (12) goes slack, take way off WT as not to over-run the anchors.
h.
Raise forward winch cable and disengage shackle (retrieval pendant) (11).
END OF WORK PACKAGE