TM 55-1945-205-10-4
0057 00 1
0057 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
OPERATION UNDER UNUSUAL CONDITIONS
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Rail and Marine) (Item 7, WP 0106 00)
Life Preserver, Vest (Item 31, WP 0104 00)
Gloves, Mens and Womens (Leather Palm) (Item 23, WP 0104 00)
Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)
Helmet, Safety (Item 27, WP 0104 00)
Crowbar (Item 14, WP 0104 00)
Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)
Personnel Required
Seaman 88K
Equipment Condition
Off Shore Mooring Legs Stowed. (WP 0063 00)
On Shore Mooring Legs Stowed. (WP 0064 00)
Dunnage Mats Removed And Stowed. (WP 0036 00, WP 0058 00)
Fenders Removed And Stowed. (WP 0040 00, WP 0066 00, WP 0067 00)
Light Towers Removed And Stowed. (WP 0037 00, WP 0062 00)
PREPARATION FOR TOWING-UNUSUAL ENVIRONMENT/WEATHER
PREPARE THE TRIDENT PIERHEAD FLOATING CAUSEWAY FOR TOWING
:,1*
All personnel must wear personal flotation device, hard hat, safety shoes and gloves
during FC operations and maintenance. Failure to observe these precautions could
result in serious injury or death.
Ensure any ancillary equipment is stowed and secured to the deck. Failure to
observe these precautions could result in serious injury or death.
1.
Disassemble floating causeway for towing configuration.