TM 55-1945-205-10-40057 00 10057 00OPERATOR MAINTENANCEFLOATING CAUSEWAYOPERATION UNDER UNUSUAL CONDITIONSINITIAL SETUP:ToolsTool Kit, General Mechanic’s (Rail and Marine) (Item 7, WP 0106 00)Life Preserver, Vest (Item 31, WP 0104 00)Gloves, Men’s and Women’s (Leather Palm) (Item 23, WP 0104 00)Goggles, Sun, Wind and Dust (safety) (Item 25, WP 0104 00)Helmet, Safety (Item 27, WP 0104 00)Crowbar (Item 14, WP 0104 00)Hammer, Hand (10 lb Sledge) (Item 26, WP 0104 00)Personnel RequiredSeaman 88KEquipment ConditionOff Shore Mooring Legs Stowed. (WP 0063 00)On Shore Mooring Legs Stowed. (WP 0064 00)Dunnage Mats Removed And Stowed. (WP 0036 00, WP 0058 00)Fenders Removed And Stowed. (WP 0040 00, WP 0066 00, WP 0067 00)Light Towers Removed And Stowed. (WP 0037 00, WP 0062 00)PREPARATION FOR TOWING-UNUSUAL ENVIRONMENT/WEATHERPREPARE THE TRIDENT PIERHEAD FLOATING CAUSEWAY FOR TOWING:,1*All personnel must wear personal flotation device, hard hat, safety shoes and gloves during FC operations and maintenance. Failure to observe these precautions could result in serious injury or death.Ensure any ancillary equipment is stowed and secured to the deck. Failure to observe these precautions could result in serious injury or death.1.Disassemble floating causeway for towing configuration.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business