TM 55-1945-205-10-40057 00 50057 006.Connect floating causeway intermediate sections along sides, as required, with guillotine connectors. (WP 0012 00)7.Connect floating causeway intermediate sections end to end, as required. a.Rotate and pull chute bolts (2) to unlocked position.b.Lift guillotines (4) and (6) from flexor connector slots.c.Using a crowbar (3) push each flexor connector from the left end rake into corresponding pocket of right end rake until guillotines plates (4) and (6) are aligned with the flexor connector slots. d.Using a sledgehammer, drive guillotine plates (4) and (6) down into flexor connector slots.3624
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business