TM 55-1945-205-10-40057 00 60057 00e.Push chute bolts (2) to the locked position and rotate to closed position.8.Install towing bridle, towing interface and towing lights. (WP 0018 00)SECURE THE TRIDENT PIERHEAD FLOATING CAUSEWAY FROM TOWING1.Disassemble floating causeway towing configuration intermediate sections, as required, for a trident pierhead floating causeway configuration.2.Disassemble floating causeway intermediate sections along sides as required by raising female connector guillotines. (WP 0050 00)22FLOATING CAUSEW AY TRIDENT PIERHEADTOW ING CONFIGURATION
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business