TM 55-1945-205-10-4
0057 00 6
0057 00
e.
Push chute bolts (2) to the locked position and rotate to closed position.
8.
Install towing bridle, towing interface and towing lights. (WP 0018 00)
SECURE THE TRIDENT PIERHEAD FLOATING CAUSEWAY FROM TOWING
1.
Disassemble floating causeway towing configuration intermediate sections, as required, for a trident pierhead
floating causeway configuration.
2.
Disassemble floating causeway intermediate sections along sides as required by raising female connector
guillotines. (WP 0050 00)
2
2
FLOATING CAUSEW AY TRIDENT PIERHEAD
TOW ING CONFIGURATION