TM 55-1945-205-10-40058 00 10058 00OPERATOR MAINTENANCEFLOATING CAUSEWAYDUNNAGE MATSSTOWAGEINTRODUCTIONScopeThis work package covers stowage of the dunnage mats in the 20 ft side opening container.Stowage of Dunnage MatsThe following procedures are required prior to stowage of the dunnage mats:The 4 ft by 10 ft dunnage mats are stowed horizontally. Dunnage is placed on the pallet and 8 dunnage mats are stacked on the dunnage. Two additional stacks of 8 dunnage mats are stowed on dunnage on top of the first stack. Once stowed on the pallet, the mats are secured to the pallet with ratchet strap tie downs. The pallet is secured to the deck tracks with chain tie downs.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business