TM 55-1945-205-10-4
0058 00 1
0058 00
OPERATOR MAINTENANCE
FLOATING CAUSEWAY
DUNNAGE MATS
STOWAGE
INTRODUCTION
Scope
This work package covers stowage of the dunnage mats in the 20 ft side opening container.
Stowage of Dunnage Mats
The following procedures are required prior to stowage of the dunnage mats:
The 4 ft by 10 ft dunnage mats are stowed horizontally. Dunnage is placed on the pallet and 8 dunnage mats are
stacked on the dunnage. Two additional stacks of 8 dunnage mats are stowed on dunnage on top of the first stack.
Once stowed on the pallet, the mats are secured to the pallet with ratchet strap tie downs. The pallet is secured to the
deck tracks with chain tie downs.