TM 55-1945-205-10-4
0057 00 10
0057 00
b.
Lift guillotine plates (4) and (6) from flexor connector slots.
c.
Using crowbar (3) push each flexor connector from left end rake into corresponding pocket of right end rake
until guillotines (4 and 6) are aligned with flexor connector slots.
d.
Using a sledgehammer, drive guillotines (4) and (6) down into flexor slots.
e.
Push chute bolts (2) to locked position and rotate to closed position.
7.
Install fenders, as required.
8.
Install light towers, as required.
9.
Remove towing bridle, towing interface and towing lights. (WP 0042 00)
10. Deploy off shore mooring legs. (WP 0033 00)
11. Deploy on shore mooring legs. (WP 0034 00)
END OF WORK PACKAGE