TM 55-1945-205-10-40057 00 90057 004.Position floating causeway intermediate sections, as required, to a trident pierhead floating causeway configuration using a warping tug.5.Connect floating causeway intermediate sections along sides, as required, with guillotine connectors. (WP 0012 00)6.Connect floating causeway intermediate sections end to end, as required.a.Rotate and pull the chute bolts (2) to unlocked position.FLOATING CAUSEW AY TRIDENT PIERHEAD3426
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business