Home
Download PDF
Order CD-ROM
Order in Print
INSPECT COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE FOR WATER - TM-55-1945-205-24-2_216
PRESSURE TEST COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE - TM-55-1945-205-24-2_218
TM-55-1945-205-24-2 Modular Causeway System (MCS) Roll-On/Roll-Off Discharge Facility Model (RRDF) RRDF-1 NSN 1945-01-473-2282 Manual
Page Navigation
155
156
157
158
159
160
161
162
163
164
165
TM 55-1945-205-24-2
0063 00 1
0063 00
UNIT LEVEL MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
COMBINATION BEACH/SEA END SECTION
NON-POWERED MODULE
PRESSURE TEST
INITIAL SETUP:
Test Equipment
Test Set, Compartment Air (Item 75, WP 0359 00)
Tools
Tool Kit, General Mechanic’s (Rail and Marine) (Item 82, WP 0359 00)
Gloves, Chemical (Item 25, WP 0359 00)
Goggles, Industrial (Chipping, Chemical) (Item 28, WP 0359 00)
Compressor Unit
, Reciprocating, Power Drive (Item 13, WP 0359 00)
Socket Wrench Set (Item 92, WP 0359 00)
Socket, Socket Wrench (Item 93, WP 0359 00)
Key, Socket Head Screw (Allen Wrench) (Item 94, WP 0359 00)
Materials/Parts
Sealing Compound (Item 48, WP 0358 00)
Personnel Required
Engineer 88L
Equipment Condition
Combination Beach/Sea End Section Non-Powered Module Dry-Docked.
PRESSURE TEST COMBINATION BEACH/SEA END SECTION NON-POWERED MODULE
NOTE
The following procedure is typical for pressure testing all non-powered modules and for
pipe plug location.
1.
Remove test set (1), sensing line (2) and charging line extension hose (3) from storage box.
9
6
5
3
13
7
15
8
14
2
12
11
10
AIR SUPPLY
4
1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business