TM 55-1945-205-24-2
0124 00 2
0124 00
4.
Tag and disconnect wiring (7) from receptacle (4).
5.
Discard receptacle (4).
INSTALL PERSONNEL SHELTER HOSPITAL GRADE STRAIGHT BLADE
ELECTRICAL RECEPTACLE
1.
Connect wiring (7) to new receptacle (4) and remove tags.
2.
Install two screws (5) securing receptacle (4) to circuit box (6). Tighten screws (5).
3.
Install screw (2) securing receptacle cover (3) to receptacle (4). Tighten screw (2).
4.
Close weather cover (1).
END OF WORK PACKAGE