TM 55-1945-205-24-20122 00 20122 00a.Tag and disconnect electrical wiring.b.Unscrew stuffing tube cap (6) from the stuffing tube (7).c.Remove wiring (4) from the stuffing tube (7) and retain the cap (6), plastic washers (8) and preformed packing (9) on the end of the wiring (4).4.Remove four screws (10) and washers (11) securing the junction box (5) to the wall (12).5.Remove the junction box (5).INSTALL PERSONNEL SHELTER HEAD ELECTRICAL JUNCTION BOX1.Position the junction box (5) on the wall (12) and secure with four screws (10) and washers (11). Tighten screws (10).2.Install cable and wires (4) in junction box (5).a.Slide wiring (4) into stuffing tube (7) and into junction box (5).b.Tighten stuffing tube cap (6), plastic washers (8) and preformed packing (9) onto end of the stuffing tube (7) until secure.c.Connect electrical wiring and remove tags.3.Close enclosure cover (2) and secure by tightening two screws (3).4.Position circuit breaker D (1) on the personnel shelter electrical distribution board to ON.END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business