TM 55-1945-205-24-2
0122 00 1
0122 00
DIRECT SUPPORT MAINTENANCE
ROLL-ON/ROLL-OFF DISCHARGE FACILITY
PERSONNEL SHELTER HEAD ELECTRICAL JUNCTION BOX
REMOVAL AND INSTALLATION
INITIAL SETUP:
Tools
Tool Kit, General Mechanics (Item 81, WP 0359 00)
Personnel Required
Engineer 88L
REMOVE PERSONNEL SHELTER HEAD ELECTRICAL JUNCTION BOX
NOTE
The following procedure is typical for the removal and installation of the personnel shelter
head electrical junction box.
1.
Position circuit breaker D (1) on the personnel shelter electrical distribution board to OFF.
2.
Open enclosure cover (2) by loosening two screws (3).
3.
Remove wiring (4) from junction box (5).
1
CKT D
TOILET LTG & VENT
120VAC, 1PH, 60HZ
FDR (SHLTR PNL)-1L-D(1)
6
8
4
5
3
9
11
10
2
7
12