TM 55-1945-205-24-2
0162 00 3/4 blank
0162 00
5.
Connect wires (1) to capacitor (3) and
ballast
(2) and remove tags.
6.
Install light tower ballast box cover. (WP 0161 00)
7.
Install light tower
ballast
box panel end. (WP 0160 00)
8.
Install light tower control panel key switch. (WP 0154 00)
9.
Install light tower control panel 125 volt breaker. (WP 0153 00)
10. Install light tower control panel toggle switches. (WP 0152 00)
11. Install light tower control panel main
circuit breaker
. (WP 0151 00)
12. Install light tower control panel twist lock outlet. (WP 0150 00)
13. Install light tower control panel duplex outlet. (WP 0149 00)
14. Install light tower control panel fuel gage. (WP 0148 00)
15. Install light tower control panel hour meter. (WP 0147 00)
16. Install light tower control panel. (WP 0163 00)
17. Install light tower battery negative lead terminal. (WP 0134 00)
18.
Perform operational check
of light tower. (TM 55-1945-205-10-2)
END OF WORK PACKAGE