TM 55-1945-205-24-2
0275 00 2
0275 00
3.
Loosen the engine end fitting of the pressure hose (3) to relieve residual pressure in the water
pressure hose (3).
4.
Remove two hex nuts (5) and external tooth lock washers (6) from gauge mounting studs (7).
5.
Remove water pressure gauge (2) from front of control console (8) and discard water pressure gauge (2).
6.
Remove drain pan and dispose of contents in accordance with local procedures.
INSTALL RHIB WATER PRESSURE GAUGE
1.
Position new water pressure gauge (2) through hole in front of control console (8).
2.
Position gauge mounting bracket (9) over gauge mounting studs (7).
3.
Install two external tooth lock washers (6) and hex nuts (5) on gauge studs (7). Tighten nuts (5).
4.
Connect pressure hose (3) to rear of water pressure gauge (2) by turning the coupling (4) clockwise. Tighten
coupling (4).
5.
Install electrical wire socket (1) into rear of water pressure gauge (2).
6.
Remove tag from electrical wire socket (1).
7.
Clean up spilled fluid with a spill kit and dispose of spill kit waste in accordance with local procedures.
8.
Install RHIB battery negative lead terminal. (WP 0336 00)
9.
Perform operational check of RHIB. (TM 55-1945-205-10-2)
END OF WORK PACKAGE