TM 55-1945-205-24-2
0276 00 2
0276 00
1.
Tag and disconnect throttle horn two-socket plug (4), control assembly three-socket plug (5) and control assembly
six-socket plug (6).
2.
Tag and disconnect three engine electrical connectors (7).
3.
Remove and discard all in line tiedown straps.
4.
Remove and retain all in line wire bundle clamps.
5.
Remove wiring harness (8) and discard.
INSTALL RHIB INSTRUMENT WIRING HARNESS
1.
Lay out the new wiring harness along its route to ensure proper length at each end is achieved prior to installing
tiedown straps and wire bundle clamps.
2.
Connect electrical wiring to trim/tilt gauge (1), tachometer gauge (2) and water pressure gauge (3).
WARNING
3.
Apply electrical grease to throttle horn two-socket plug (4), control assembly three-socket plug (5) and control
assembly six-socket plug (6) rubber seals.
4.
Connect throttle horn two-socket plug (4), control assembly three-socket plug (5) and control assembly
six-socket plug (6).
WARNING
5.
Apply electrical grease to three engine electrical connectors (7) rubber seals.
6.
Connect three engine electrical connectors (7).
7.
Remove all tags for wiring harness (8).
8.
Install in line tiedown straps (minimum placement every 24 in.).
9.
Install all in line wire bundle clamps.
10. Install RHIB battery negative lead terminal. (WP 0336 00)
11. Perform operational check of RHIB. (TM 55-1945-205-10-2)
END OF WORK PACKAGE